Umahi Dares Makinde to Public Debate over Lagos-Calabar Highway Costs – Landslide News
  • Latest
  • Trending
  • All
  • Business
  • Politics
  • Global
  • Lifestyle
  • Tech

Umahi Dares Makinde to Public Debate over Lagos-Calabar Highway Costs

October 13, 2025

Fans React as Funke Akindele Misses Kamo State’s Movie Premiere

September 21, 2026

Anambra Loans: APC Calls on Obi to Honour 2027 Pledge

September 21, 2026

Mambilla Deal: EFCC Launches Probe Into Atiku, Malami

September 21, 2026

Melaye Questions Simultaneous Absence of Tinubu Shettima

September 21, 2026

Adamawa 2027: Haske Announces Safri Glah as Running Mate

September 21, 2026

Presidency Denies Tinubu-US Rift

September 21, 2026

Obi, Kwankwaso Vow to Tackle Insecurity at Kaduna Town Hall

September 21, 2026

Keyamo: NDC Thugs Ransack Shops

September 21, 2026

2027: Yari Tells Northerners to Drop Presidency Demand

September 21, 2026

Oluremi Tinubu Turns 66, Yilwatda Applauds Her Humanitarian Work

September 21, 2026

Former Kogi Governor Ibrahim Idris Dies at 77

September 21, 2026

Oseni: Wike Playing Politics for 2031

September 21, 2026
Landslide News
  • Home
  • Breaking News
  • Global
  • Business
  • Entertainment
    • Movies
    • Music
  • Fashion
  • Health
  • Lifestyle
  • Politics
  • Sports
  • Advertise
Create a Channel
No Result
View All Result
Landslide News
  • Home
  • News Insights @ LandslideNews
  • Breaking News
  • Politics
  • Global
  • Business
  • Entertainment
    • Movies
    • Music
  • Fashion
  • Health
  • Lifestyle
  • Sports
  • Tech
  • Advertise

Umahi Dares Makinde to Public Debate over Lagos-Calabar Highway Costs

byCamela Obedu
October 13, 2025
in Politics
0

Minister of Works, David Umahi, has challenged Oyo State Governor Seyi Makinde to a public debate on civil engineering, following the governor’s criticism of the over ₦15 trillion Lagos–Calabar Coastal Highway project.

Umahi, who made the remark during an inspection of the Mararaba–Keffi dual carriageway in Nasarawa State alongside Governor Abdullahi Sule, defended the cost and design of the project, saying it was misleading to calculate an “average cost per kilometre” for such a massive undertaking.

Reacting to Makinde’s recent comments questioning the transparency of the project’s cost, Umahi stated that road construction varies widely in design and materials, making uniform pricing impossible. He described Makinde’s analysis as “misinformed” and “outside his area of expertise.”

“When I heard what my brother and friend, Governor Seyi Makinde, said, I chose initially not to respond. He is an electrical engineer, we call it ‘elect-elect’ but this is civil engineering,” Umahi said. “I am his senior both in governance and in engineering practice. If he does not understand certain issues, he should ask me. However, he should withdraw the statement that I am ‘dancing around.’ I never danced around anything.”

He then threw down the gauntlet: “If he insists, let him come for a public debate. I am ready.”

The minister explained that there is a clear distinction between an estimated and a definitive project cost. “Cost per kilometre can only be determined after factoring in design variations, soil type, materials, bridges, and drainage,” Umahi noted. “Ask AI the difference between cost per kilometre and average cost — it will confirm what I said.”

During the same visit, Umahi announced the withdrawal of the Abuja-bound carriageway of the ongoing Mararaba–Keffi Road reconstruction project from the Chinese firm, China Harbour Engineering Company Limited, citing poor performance and disregard for directives.

He said the section would now be handled by local contractors to ensure faster and higher-quality delivery. “From tomorrow, local contractors will be mobilised to handle both the inner and outer shoulders using reinforced concrete,” he said.

The minister accused China Harbour of “indiscipline and disregard for public interest,” adding that the firm repeatedly failed to maintain sections of the road outside its active work areas.

Umahi also issued a stern directive that no contractor should lay binder or pavement without first completing the shoulders. He warned that payment certificates would not be issued for substandard works and ordered ministry officials to report all project challenges within 24 hours.

“I take responsibility for not acting sooner,” Umahi said. “But going forward, every controller and zonal director must report problems directly to me.”

He revealed that the redesigned construction method includes a 3.5 per cent cement-stabilised base, 20-centimetre-thick concrete shoulders, and the milling of existing asphalt before new layers are applied,  a process he said would give the road a lifespan of at least 40 years.

Umahi reaffirmed President Bola Tinubu’s commitment to quality infrastructure delivery, warning contractors against lobbying or political interference. “If anyone in the ministry asks you for money, report it publicly. We will protect this country’s interest,” he declared

Camela Obedu

Camela Obedu

Related Posts

Fans React as Funke Akindele Misses Kamo State’s Movie Premiere

byCamela Obedu
11 minutes ago
0

Nollywood actress and filmmaker Funke Akindele has attracted attention on social media after she was absent from the premiere of...

Anambra Loans: APC Calls on Obi to Honour 2027 Pledge

byCamela Obedu
21 minutes ago
0

The All Progressives Congress (APC) Presidential Campaign Council has called on former Anambra State Governor and Nigeria Democratic Congress (NDC)...

Mambilla Deal: EFCC Launches Probe Into Atiku, Malami

byCamela Obedu
30 minutes ago
0

The Economic and Financial Crimes Commission (EFCC) has reportedly constituted a special investigation team to examine individuals named in an...

Melaye Questions Simultaneous Absence of Tinubu Shettima

byRosemary Ani Pius
33 minutes ago
0

African Democratic Congress (ADC) chieftain, Dino Melaye, has expressed concern over President Bola Ahmed Tinubu and Vice-President Kashim Shettima being...

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

I agree to the Terms & Conditions and Privacy Policy.

This website uses cookies. By continuing to use this website you are giving consent to cookies being used. Visit our Privacy and Cookie Policy.